PUBLIC NOTICE
PUBLIC NOTICE OF PROPOSED CDBG DISASTER RECOVERY MITIGATION INFRASTRUCTURE PROJECTS FOR THE SUWANNEE WATER AND SEWER DISTRICT
The Suwannee Water and Sewer District anticipates applying for Community Development Block Grant – Disaster Recovery (CDBG-DR) funding provided by the U.S. Department of Housing and Urban Development (HUD) to support long-term restoration, facility hardening and mitigation efforts following the 2023-2024 storms. This program is administered by the Florida Commerce Department through the Community Development Block Grant – Disaster Recovery (CDBG-DR) Program. A total of Nine hundred twenty-five million, three hundred ninety-four thousand Dollars ($925,394,000.00) has been allocated to the State of Florida for the 2023 and 2024 Storm Events. Four hundred million dollars ($400,000,000.00) of that amount has been allocated, by Florida Commerce, to fund infrastructure restoration, hardening and mitigation projects in communities impacted by the 2023 and 2024 storms. The minimum allowable amount a community can request is seven hundred fifty thousand dollars ($750,000.00). Applications are due to Florida Commerce on or before September 29, 2025. Eligible types of projects are those that demonstrate increased community resiliency. Examples of some of the types of projects encouraged by Florida Commerce are as follows:
Activities that are typically eligible for funding under the Community Development Block Grant (CDBG) Program as well as specific additional activities as outlined in the State of Florida CDBG-DR Action Plan for the program are eligible projects if no other funding is available to meet the need.
The Suwannee Water and Sewer District anticipate submitting one application for a total of twenty-two million, six hundred eighty-two thousand, nine hundred fifty dollars and fifty cents ($22,682,950.50) in funding. The project synopsis and budget for the application being submitted are as follows:
Application #1 – Suwannee Water and Sewer District Sanitary Sewer Collection System and Wastewater Treatment Plant Repair and Hardening Project: The project involves hardening of the Suwannee Water and Sewer District’s Wastewater Treatment Plant (WWTP) and Sanitary Sewer Collection System. The Suwannee Water and Sewer District serve’s the southwestern portion of Dixie County. which is in Census Tract 9702.01 and includes Block Group #1. Based upon the Census information, the Area Served by the Suwannee Water and Sewer district is 37.30% LMI. Based upon the Census information, the Service area is not Low Moderate Income. However, the District is currently carrying out a door-to-door survey of the Service Area. If the door-to-door survey results indicate the Service Area is low-and-moderate income, the application will be submitted as benefiting a LMI Income population. However, based upon the significant flooding and other damage the Suwannee Water and Sewer District Service Area sustained resulting from the 2024 storm events, at this time, the District anticipates submitting the application as an Urgent Need project.
The proposed project includes the following activities:
The proposed budget for the Suwannee Water and Sewer District Sanitary Sewer Plant Hardening Project is as follows:
|
Structure Name |
Project Address or Description |
CDBG-DR |
Matching Funds |
Total Project Costs |
|
Project Administration |
N/A |
$ 1,080,140.50 |
$ 0.00 |
$ 1,080,140.50 |
|
Project Engineering Design, Permitting, Bidding and Award Services |
N/A |
$ 2,105,640.00 |
$ 0.00 |
$ 2,105 640.00 |
|
Project Engineering Services During Construction |
N/A |
$ 1,403,760.00 |
$ 0.00 |
$ 1,403,760.00 |
|
Completion of the HUD Environmental Review |
N/A |
$ 20,000.00 |
$ 0.00 |
$ 20,000.00 |
|
Davis Bacon and Section 3 Oversight During Construction |
N/A |
$ 526,410.00 |
$ 0.00 |
$ 526,410.00 |
|
Wastewater Treatment Plant Improvements |
Harden the Wastewater Treatment Plant to Enable the Plant to Sustain Operation during and immediately after significant storm events |
$17,547,000.00 |
$ 0.00 |
$17,547,000.00 |
|
Totals |
|
$22,682,950.50 |
|
$22,682,950.50 |
Any resident wishing to know more about the proposed project or submit any public comment on the proposed projects should contact Raelynn Brownell, Manager, Suwannee Water and Sewer District at (352) 542-7570 or by email at rbrownell@suwanneewater.com. Comments from the public concerning these projects will be received from September 18, 2025, and must be received by the SWSD no later than noon on Monday, September 29, 2025. All comments will be considered, and proposed changes will be submitted to Florida Commerce. Information relating to the proposed project and application is available for review between 8:00 a.m. and 4:00 p.m. at the Suwannee Water and Sewer District Office located at 825 SE 327th Street, Suwannee, Florida 32692.
Any non-English speaking person wishing to comment on the proposed project should contact Ms. Brownell at (352) 542-7570 or by e-mail at rbrownell@suwanneewater.com and a language interpreter will be provided. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
The Suwannee Water and Sewer District is a Fair Housing/Equal Opportunity/Handicap Accessible Agency.